A New Look

BEAUTIFICATION-1_Page_1_Image_0001

Oak Brook Beautification Initiative Underway

The Village of Oak Brook has launched an exciting beautification initiative to revitalize key public spaces and enhance the community’s appeal for residents, visitors, and businesses. With the last major beautification effort taking place over a decade ago, the Village Board of Trustees has committed to a thoughtful and forward-looking investment in Oak Brook’s landscape.

The project focuses on three prominent locations:

  • Route 83 and 22nd Street
  • 22nd Street/I-88 Underpass
  • York Road and 22nd Street

While each site features unique improvements, all share updated branding elements to create a cohesive visual identity throughout the Village.

At Route 83 and 22nd Street, the southwest corner will receive new gateway signage and landscaping, while the northeast corner will include a gateway bollard and native plantings in the drainage area. The median on Route 83 will be reconstructed with decorative concrete knee walls and elevated plantings, including trees and flowers.

The 22nd Street/I-88 underpass will be enhanced with upgraded lighting and branding features to improve both safety and aesthetics. These improvements will also help visually connect the east and west sides of the viaduct, creating a more unified and inviting environment.

At York Road and 22nd Street, the project includes new gateway signage, fresh landscaping, and enhancements to the median south of the intersection, designed to mirror the median improvements at Route 83 for a consistent look.

CivilTech Engineering, a leading transportation design firm with experience in working with over 70 Illinois municipalities, is spearheading the design and engineering. Jim Woods, Oak Brook’s Contract Civil Engineer, noted:

“Monument signage, viaduct improvements, and landscaped medians will enhance the aesthetics of key areas in Oak Brook. The design incorporates materials and elements that reflect the community’s rich culture, history, and traditions—establishing a distinct identity and a strong sense of arrival.”

Residents provided feedback at a public open house held in June. The project is currently undergoing a coordinated review by the Village, the Illinois Tollway, and the Illinois Department of Transportation. Pending final approvals, completion is anticipated within 18 months.

Author

IMG_4386

Facing The Challenge: Oak Brook officials optimistic about the future of office occupancy rates

IMG_4386

Facing The Challenge: Oak Brook officials optimistic about the future of office occupancy rates

HIL_8575-EDIT-e1693512641982

Down to a Science

Executive Chef Stephen Langlois

Feeding His Passion

20230703-990A9690

A Rousing Success

0S2A5429

Authentic Internal Medicine Building relationships with patients and the community

Arizona-Biltmore-Exterior

Discover Arizona

AversNEView

Out of the ashes

Tucumcari, New Mexico, USA - May 13, 2016 : Historic Blue Swallow Motel with vintage cars parked in front of it. This building is listed on the National Register of Historic Places in New Mexico as a part of historic U.S. Route 66.

Celebrating A Century of Open Road

20230801_175934

National Night Out

Shine Pediatric Dentistry

Shine Pediatric Dentistry

Davidson surrounded by students on campus.

Timothy Christian Schools: Where students are challenged to realize their full potential